printer friendly

Canals

Sketch of Burswood Estate and the Peninsula, belonging to H Camfield Esq, Swan River, Western Australia. Battye Library [Map 2/5/19][Online: http://purl.slwa.wa.gov.au/slwa_b1817049_2]

Rivers were at this time seen as the ideal means of transporting goods and were increasingly engineered by dredging, to accommodate larger loads. The Swan River was remade for transportation purposes by removing sandbars, filling and dredging channels.

The first change made to the natural environment after European settlement was in 1831 when a canal was cut making Burswood into an island. (Camfield Henry, Correspondence and legal documents 1829-1865, Acc 1459A).

In 1833 a tender was released for the construction of a dyke to block channels between islands with:

"duble stake and a wattled fence filled in with clay, three feet above low water and three feet high." [16]

When the first canal was relatively unsuccessful, a second canal was cut in 1834.

Thompson, James. Improvements to Swan River Navigation 1830-1840. Battye Library [Map 29/7/4][Online: http://purl.slwa.wa.gov.au/slwa_b1817049_2]

In addition the River was straightened in an effort to correct what were seen as nature’s shortcomings. The arguments used to dredge and straighten the river were utilitarian and health based.

Share this page   share on Facebook share on Twitter share on stumbleupon

Page last updated: Tuesday 26 May 2020 by Illona Tobin Asset ID 13120
Editors for this page nick 2nd account
login

 

Please note: The content on this website is made available for archival purposes and may not meet the State Library of Western Australia's current standards for web accessibility, mobile device compatibility, historical accuracy and cultural sensitivity.